KnowledgeECONOMICS
CONTACT US
Hunan Perfect Industry Co.,Ltd
Contact: Manager Hu, Manager Yi
Hotline:008618507312158
Cell phone:008613974960765
Address:Xiangyin County Industrial Park, Yueyang City, Hunan Province, China
Current location: HOME »Knowledge »vertical turbine pump
Demolition of LC Vertical Long Shaft Pump
The disassembly sequence of LC vertical long shaft pump can be basically carried out in reverse of the assembly sequence. When disassembling LC vertical long shaft pump, the following points should be noted:
(1) Make matching marks at the necessary matching points to facilitate the next installation of LC vertical long-axis pump.
(2) Prepare some boxes, assemble and disassemble the parts, in order to prevent loss or scratch, fasteners are put separately.
(3) The following parts can not be reused, and spare parts need to be prepared: O-ring, paper cushion, rusty fastener, spring washer, filler.